Circular 20/12: Regulations of the People's Republic of China on the prevention and control of Marine Pollution from Ships

Trulli

OUTLINE

• This circular refers to the earlier Circular 17/12 "Regulations of the People's Republic of China on the Prevention and Control of Marine Pollution from Ships"

• A revised set of FAQs is attached to this circular taking account of the revised Detailed Rules although the further MSA Notice anticipated in circular 17/12 has not yet been published.

• If a new MSA Notice requires amendments of these attached FAQs a new set of FAQs will be issued in a future circular.

• The IG spill response contract issued with circular 17/12 has been revised further and is also attached to his circular.

TO THE MEMBERS

Dear Sirs,

REGULATIONS OF THE PEOPLE'S REPUBLIC OF CHINA ON THE PREVENTION AND CONTROL OF MARINE POLLUTION FROM SHIPS

We refer Members to

circular 17/12 "Regulations of the People's Republic of China on the Prevention and Control of Marine Pollution from Ships"

on the Regulations of the People's Republic of China (PRC) on the Prevention and Control of Marine Pollution from Ships ("the Regulations") and the requirement that owners/operators of (a) any ship carrying polluting and hazardous cargoes in bulk or (b) any other ship above 10,000 gt enter into a pollution clean-up contract with a Maritime Safety Agency (MSA) approved ship pollution response company (SPRO) before the ship enters a PRC port.

Circular 17/12 informed Members that the China MSA issued revised Detailed Rules on 14 September on the Implementation of the Administration Regime of Agreement for Ship Pollution Response amending the Detailed Rules previously issued by the China MSA which came into effect on 1 January 2012. Members were informed that a further MSA Notice was expected shortly and that a revised set of FAQs on the revised Detailed Rules would be published once this Notice had been issued.

However, the further MSA Notice has yet to be issued and it is uncertain whether it will be before the end of this month. Since many owners will be signing new spill response contracts with SPROs in the near future, the revised set of FAQs taking account of the revised Detailed Rules have been issued as contained in Annex I to this circular in advance of any further MSA Notice. In the event that a new MSA Notice is issued shortly and it is necessary to amend the attached revised FAQs as a result, a new set of FAQs will be issued.

The China MSA also issued an amended model spill response contract as an annex to the revised Detailed Rules issued on 14 September. As a result, a revised, IG recommended spill response contract was attached to circular 17/12, the content of which did not differ substantially from the previous IG recommended contract and which was consistent with the MSA's revised Detailed Rules. However, it has since been necessary to amend the IG recommended contract in order to take account of some editorial amendments. The amended IG recommended contract with these changes is contained in Annex II to this circular. The content of the amended IG model contract does not differ substantially from the previous IG recommended contract attached to circular 17/12.

Any Member requested to agree to a variation of the attached recommended contract is advised to check with the Club to ensure that such variations do not cause the contract to fall outside the scope of the IG Guidelines.

If Members are in any doubt about the contract then it is recommended that they contact the Club before contracting with any SPRO.

All clubs in the International Group of P&I Clubs have issued similar circulars.

CONTACT

Members requiring further information should contact Helen Huang (Tel:+852 2832 4436 email: helen.huang@thomasmiller.com ) or Dr Chao Wu (Tel: +44 20 7204 2157 email:chao.wu@thomasmiller.com

Downloads

  • 9791 - Table attachment to Circular 49 KB

    04/05/2016

    Download PDF
  • 9793 - ChinaOilPollutionSPRO_FAQs21Dec12 194 KB

    04/05/2016

    Download PDF
  • 9792 CLAIMSPIFDD4960124v1ChinaIGSampleAgreement191212 0 B

    28/03/2022

    Download
  • 30120 IGRevisedSampleAgreement201112pdf 439 KB

    05/10/2017

    Download PDF

Staff Author

UK P&I

Date24/12/2012