New draft reporting requirements at Philadelphia

Effective immediately vessels scheduled to call at terminals on the Delaware River North of the Ben Franklin Bridge must report their arrival and departure air draft and deep draft to the Pilot’s Association 72 hours before arrival at the pilot station. The Bridge will be undergoing maintenance for the next 4 years and the project requires scaffolding hanging beneath the bridge that reduces the available clearance.
Please refer to the attached notice below from the local Pilot’s Association.
Downloads
-
Philadelphia New Air Draft and Deep Draft Reporting0D0A Requirements 310 KB
16/09/2020
Download PDF
You may also be interested in:
The IMO Marine Environmental Protection Committee (MEPC) held its 78th session (MEPC 78) remotely from June 6-10, 2022, and this article seeks to summarise the outcomes from MEPC 78.
The Club's Correspondent, Vitsan, has issued a Circular to advise Members of amendments and new provisions in the Turkish Environmental Law for Marine Pollution Incidents, published in the Official Gazette on 15 June 2022.
The Club was joined by the American Bureau of Shipping (ABS) and MidOcean Wind for presentations and discussion focusing on an overview of the U.S
Gallstones are formed when substances, such as cholesterol, bile pigments and/or calcium salts, harden into a solid form