Tanker ports update - Japan

This ports update bulletin is revised as and when new information on wet bulk terminals is received. Whilst the web page displays just those terminals where damage and or interruption has been reported, a spreadsheet listing the status of all terminals for which we have reports is attached to the bulletin. A Japan ports map listing contact numbers for all the major ports is also listed.

Port Status Terminal Detail Cargo
CHIBA  Open      
   Open Cosmo Oil  - Refining under suspension / Cargo ops in working  
  Closed No.2 Berth Unknown when to resume Jet
  Open No.10 Berth   Naphtha / Gasoil/ Jet
  Open No.14-A Pier   Chemical
  Closed Sea Berth Under regular berth maintenance Naphtha
         
         
KASHIMA  Open      
         
  Kashima Denkai    
  Open Denkai Berth   Naphtha / Salt
         
  Kashima LPG Joint Stockpiling  
  Open Kyobi Pier   LPG
         
  Kashima Oil  - Refining to resume in early June / Cargo ops in working  
  Closed COP No.1 Repair until September Crude / Naphtha
  Open COP No.2   Crude / FO / LPG
  Open COP No.3   Naphtha / FO / Gasoil
         
  Mitsubishi Chem  - Plant in operation  
  Open B-8   Chemical
         
  Shin-Etsu Chem  - Plant in operation  
  Open No.2 Operating by temporary berth Chemical
         
         
ONAHAMA  Open      
         
  Onahama Petroleum  - Coaster berths partly operating
  Closed Sea Berth Working in normal Crude / FO
         
         
SENDAI Open      
  JXNOE    - LPG ops will be resumed in end of Jun at BEST / KEROSENE ops will be resumed in end of August at BEST / Crude ops will be resumed in End of 2011 at BEST  
  Closed No.1 Pier   Crude / Product / LPG

Downloads

  • 6979 - Japan Ports Map - June 2011 1 MB

    11/02/2016

    Download PDF

Staff Author

UK P&I

Date20/06/2011