Lessons Learnt: Vessel broke free from moorings in strong winds

Vessel Type: Bulk CarrierIncident description
The subject vessel was berthed on a NNE heading, port side to an exposed quay for cargo discharge operations. In the early morning, the wind was observed to increase in strength from the NW. The Master ordered the crew to deploy additional mooring ropes, with the final arrangement reported to be 4 head/stern lines, 2 breast lines and 2 spring lines forward and aft. The wind was logged as progressively increasing during the morning, eventually gusting to Beaufort force 9 to 10. With the ship fully exposed to gale force winds on the port beam, she began to move off the berth with all the forward mooring ropes either parting or rendering on the winches. Despite the Master letting go the port anchor, the ship continued to pivot about the stern lines and heavily contacted an opposing quay, causing significant damage to both the port structure and the vessel. The situation was eventually controlled with the assistance of a pilot and tugs and the vessel berthed safely alongside a more sheltered quay.Analysis
The strong winds experienced by the vessel had in fact been forecast in a number or weather reports received by the vessel over the 24 hours preceding the incident and should therefore have been expected by the Master. The number of mooring ropes deployed in anticipation of gale force winds was insufficient, particularly taking into consideration the exposed nature of the berth. The Master should also have considered requesting an alternative, more sheltered berth, or even departed for the open sea upon becoming aware of the deteriorating weather forecasts. However, the possibility of proceeding out to sea would depend upon the status of safe stowage and securing of the cargo remaining on board. The Master did belatedly request tug assistance but only after the vessel had started to part her moorings.Lessons Learnt
- The incident highlights the importance of proper bad weather contingency planning when in port
- The Master should have anticipated the problems experienced by the vessel and prepared accordingly in good time
- Vessels should have the capacity to deploy additional moorings in advance of bad weather. In this case the number of ropes was insufficient
- When making a risk assessment, the Master should have in mind the possibility of vacating an exposed berth as circumstances allow
- The consequences of such loss of control within the confines of a port can be very serious, with risk of damage to vessels and port structures, pollution and death or injury to personnel.
You may also be interested in:
A Solution to Pollution
03/05/2023
An oil spill is an ‘all hands-on deck!’ moment, inviting everyone from insurers, charterers, owners, the U.S. Coast Guard, local and state authorities, property, and ecological interests, and more to get involved. Tying all these parties together is the Oil Pollution Act of 1990 (‘OPA’).
Loading grain cargo in the Pacific Northwest
03/05/2023
Loading grains in the Pacific Northwest can be a real test of patience. For shipowners not familiar with the Pacific Northwest, where it rains approximately 150 to 180 days per year, with rainfall totals averaging 40 inches per year, it is important to maximise loading during periods of light rain and to prevent vessel delays while avoiding moisture damage to the cargo during periods of moderate to heavy rain.
The region comprising Latin America and the Caribbean is a busy one for the UK P&I Club. Some prominent Members have a large number of tons entered with the Club and have this region as their principal place of business. Moreover, many of the Club’s entered ships frequently call at Latin American and Caribbean ports regardless of where the Member is based, which can undoubtedly be anywhere in the world.
With cargo’s newfound ability to go well beyond the vessel and even the port, container lines face new liabilities. The intermodal capability means that containers transit on public highways and railroads, areas traditionally excluded from P&I cover. This new type of risk has given rise to the Through Transport Club (‘TT Club’), a specialised transport and logistics mutual covering risks complementing P&I cover. Both covers dovetail with one another through corresponding cover and exclusions during ocean transit.